One of the most important sectors in infrastructure development in Laos is road construction. However, many road construction projects in Laos suffer from extensive delays. This causes damage such as recurring problems in the road construction industry, and has a negative effect on the success of road construction projects in terms of schedule, cost, quality, safety and the amenity of road users. The goal of this study is to determine the main causes of these delays and to offer remedies. To identify the causes of delays, a questionnaire is designed by modifying one used to measure causes of delays in road construction projects in the West Bank in Palestine and in consultation with engineering experts with more than 10 years of experience in Laos road construction projects. A total of 53 causes of delay are identified as important in Laos. Questionnaire respondents included 35 contractors, 31 owners and 24 consultants in total. The survey results indicate that the five top factors causing road construction delays are: Contractor cash flow; Delayed payment by owner; Difficulties in financing project by contractor; Financial issues related to owner; and Insufficient equipment and vehicles for the work.
Soumphonphakdy Bounthipphasert. 2020. \u201cCauses of Delays in Road Construction Projects in Laos\u201d. Global Journal of Research in Engineering - E: Civil & Structural GJRE-E Volume 20 (GJRE Volume 20 Issue E3): .
Crossref Journal DOI 10.17406/gjre
Print ISSN 0975-5861
e-ISSN 2249-4596
Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.
Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.
Total Score: 149
Country: Japan
Subject: Global Journal of Research in Engineering - E: Civil & Structural
Authors: Soumphonphakdy Bounthipphasert , Nakamura Shozo, Okumatsu Toshihiro, Nishikawa Takafumi (PhD/Dr. count: 0)
View Count (all-time): 213
Total Views (Real + Logic): 2464
Total Downloads (simulated): 1120
Publish Date: 2020 09, Fri
Monthly Totals (Real + Logic):
This paper attempted to assess the attitudes of students in
Advances in technology have created the potential for a new
Inclusion has become a priority on the global educational agenda,
One of the most important sectors in infrastructure development in Laos is road construction. However, many road construction projects in Laos suffer from extensive delays. This causes damage such as recurring problems in the road construction industry, and has a negative effect on the success of road construction projects in terms of schedule, cost, quality, safety and the amenity of road users. The goal of this study is to determine the main causes of these delays and to offer remedies. To identify the causes of delays, a questionnaire is designed by modifying one used to measure causes of delays in road construction projects in the West Bank in Palestine and in consultation with engineering experts with more than 10 years of experience in Laos road construction projects. A total of 53 causes of delay are identified as important in Laos. Questionnaire respondents included 35 contractors, 31 owners and 24 consultants in total. The survey results indicate that the five top factors causing road construction delays are: Contractor cash flow; Delayed payment by owner; Difficulties in financing project by contractor; Financial issues related to owner; and Insufficient equipment and vehicles for the work.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.