1. E. Adamides,N. Karacapilidis,H. Pylarinou,D. Koumanakos (2008). Supporting collaboration in the development and management of lean supply networks. Production Planning & Control, 19(1), 35-52.
2. Ashish Agarwal,Ravi Shankar,M. Tiwari (2006). Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach. European Journal of Operational Research, 173(1), 211-225.
3. L. Aleotti Maia,R. Qassim (1998). Minimum cost safety stocks for frequently delivery manufacturing. International Journal of Production Economics, 62(3), 233-236.
4. Ralph Badinelli (1986). OPTIMAL SAFETYβSTOCK INVESTMENT THROUGH SUBJECTIVE EVALUATION OF STOCKOUT COSTS. Decision Sciences, 17(3), 312-328.
5. Robert Carlson,Candace Yano (1986). Safety Stocks in MRPβSystems with Emergency Setups for Components. Management Science, 32(4), 403-412.
6. Chun Wu,Y. (2003). Lean manufacturing: a perspective of lean suppliers. International Journal of Operations & Production Management, 23(11), 1349-1376.
7. J. Coyle,E. Bardi,C. Langley,B. Gibson,R. Novack (2009). Supply chain management: a logistics perspective (8th ed.).
8. S. Crino,D. McCarthy,J. Carier (2007). Lean Six Sigma for supply chain management as applied to the Army Rapid Fielding Initiative. 1st Annual IEEE Systems Conference, 1-7.
9. B. Desmet,E-H Aghezzaf,H. Vanmaele (2010). A normal approximation model for safety stock optimization in a two-echelon distribution system. Journal of the Operational Research Society, 61(1), 156-163.
10. S. Graves,A. Rinnooy Kan (1993). Logistics of production and inventory. Handbooks in Operations Research and Management Science, 4, 3-760.
11. Karl Inderfurth (1991). Safety stock optimization in multi-stage inventory systems. International Journal of Production Economics, 24(1-2), 103-113.
12. Karl Inderfurth (1995). MULTISTAGE SAFETY STOCK PLANNING WITH ITEM DEMANDS CORRELATED ACROSS PRODUCTS AND THROUGH TIME. Production and Operations Management, 4(2), 127-144.
13. June Jung,Gary Blau,Joseph Pekny,Gintaras Reklaitis,David Eversdyk (2008). Integrated safety stock management for multi-stage supply chains under production capacity constraints. Computers & Chemical Engineering, 32(11), 2570-2581.
14. Yasutaka Kainuma,Nobuhiko Tawara (2006). A multiple attribute utility theory approach to lean and green supply chain management. International Journal of Production Economics, 101(1), 99-108.
15. Atul Kanyalkar,Gajendra Adil (2009). Determining the optimum safety stock under rolling schedules for capacitated multi-item production systems. International Journal of Services and Operations Management, 5(4), 498.
16. Richard Lamming (1996). Squaring lean supply with supply chain management. International Journal of Operations & Production Management, 16(2), 183-196.
17. Q. Li,S. Li (2009). A Dynamic Model of The Safety Stock Under VMI. Eighth International Conference on Machine Learning and Cybernetics, 1304-1308.
18. Q. Long,L. Liu,L. Meng,W. Chen (2009). Logistics cost optimized election in the manufacturing process based on ELECTURE-II Algorithm. Proceedings of the IEEE International Conference on Automation and Logistics
19. L. Ma,M. Lin (2008). Determination of Safety Stock for Power Enterprises Under Uncertainty. 2008 International Symposium on Computer Science and Computational Technology, 1, 92-94.
20. R. Mason-Jones,B. Nalor,D. Towill (2000). Lean, agile or leagile? Matching your supply chain to the marketplace. International Journal of Production Research, 38(17), 4061-4070.
21. P. McCullen,D. Towill (2001). Achieving lean supply through agile manufacturing. Integrated Manufacturing Systems, 12(7), 524-533.
22. Stefan Minner (1997). Dynamic programming algorithms for multi-stage safety stock optimization. OR Spektrum, 19(4), 261-271.
23. R. Natarajan,S. Goyal (1994). Safety Stocks in JIT Environments. International Journal of Operations & Production Management, 14(10), 64-71.
24. J. Naylor,M. Naim,D. Berry (1999). Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain. International Journal of Production Economics, 62(1-2), 107-118.
25. R. Patel,L. Rodrigues,V. Kamath (2010). Optimizing safety stock in manufacturing supply chain management: A system dynamics approach. 12th International Conference on Computer Modeling and Simulation, 386-391.
26. F. Qi,X. Xuejun,G. Zhiyong (2007). Research on Lean, Agile and Leagile Supply Chain. International Conference on Wireless Communications, Networking and Mobile Computing, 4902-4905.
27. E. Silver,D. Pyke,R. Peterson (1998). Inventory management and production planning and scheduling (3rd ed.). Inventory management and production planning and scheduling, 1-754.
28. David Taylor (1999). Parallel Incremental Transformation Strategy: An Approach to the Development of Lean Supply Chains. International Journal of Logistics Research and Applications, 2(3), 305-323.
29. H. Tempelmeier (2006). Inventory management in supply networks- Problems. Models,Solutions, 1-299.
30. J. Womack,D. Jones (2003). Lean Thinking.
31. H. Wu (2009). The Lean manufacture research in environment of the supply chain of modern industry engineering. 16th Conference on Industrial Engineering and Engineering Management, 297-300.
32. S. Wu,H. Wee (2009). How Lean supply chain effects product cost and quality- A case study of the Ford Motor Comapny. 6th International Conference on Service Systems and Service Management, 236-241.
33. Xiande Zhao,Fujun Lai,T. Lee (2001). Evaluation of safety stock methods in multilevel material requirements planning (MRP) systems. Production Planning & Control, 12(8), 794-803.