Analysis and Development of Adaptive Protection Scheme for Meshed Distribution Network

§ University of Maiduguri, Maiduguri, Nigeria

Send Message

To: Author

Analysis and Development of Adaptive Protection Scheme for Meshed Distribution Network

Article Fingerprint

ReserarchID

CKD3W

Analysis and Development of Adaptive Protection Scheme for Meshed Distribution Network Banner

Key Research Insights

Synthesized scholarly intelligence & interactive research assistant
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu
Reading Preferences
Font Size
Line Spacing
Background
This converted HTML version may contain rendering inconsistencies. Please refer to the PDF for the authoritative version, or click here to provide feedback.

Abstract

Integration of Distributed Generations (DGs) at distribution network levels have changed the structure from being radial to mesh; thereby causing fault currents to be fed from all the sources connected to the network. Another operational requirement is that DGs can get disconnected from the network due to disturbances or maintenance requirements leading to new network topology. This research work has, therefore, proposed an adaptive protection scheme that relies on modern communication infrastructure for its implementation, after optimally siting and sizing of DG and investigation of impact of DG on the protection system and reliability of the system. Herein, modified particle swarm optimization (MPSO) has been deployed for the optimal relay parameters values (operation time, pick up current and time dial settings). Standard communication protocol (IEC 61850) has been chosen to facilitate the communication amongst the various devices in the adaptive protection framework developed.

I. INTRODUCTION

Distributed Generators (DG) are increasingly connected to distribution systems to meet the load demand and increase the reliability of the system. With the additional connected sources, the system is no longer radial. Moreover, during a fault condition, the fault is fed from all the sources connected to the power system. Therefore, the fault current level is different compared with the radial system. Furthermore, protective relays on the main feeder must see fault currents in forward or reverse directions, and they have to detect the fault direction. Another important problem is that DGs can get disconnected from the grid due to disturbances or for maintenance. [1] Consequently, a new configuration for the system results and, if a fault occurs, a different fault current level flows. Therefore, one setting for the protective relays cannot adequately respond to the continuously changing system configuration. Thus, relays have to be adaptively coordinated for each new system configuration to achieve correct fault clearance operation.

II. DG INSTALLATION PROBLEM FORMULATION

In this work the objective of the placement technique for the DG is to minimize the real power loss and to improve the voltage profile at the distribution level. The real power loss reduction in a distribution system is required for efficient power system operation. The loss in the system can be calculated using (1) in [3], called the 'exact loss formula' given the system operating conditions. The objective of the placement technique is to minimize the total real power loss and improved voltage profile. Mathematically, the objective function can be written as:

Minimize

(1)PL=∑i=1N|Ii|2Ri

Subject to power balance constraints.

(2)∑i=1NPDGi=∑i=1NPDi+PL

Voltage Constraints: |Vi|min≤|Vi|≤|Vi|max

Currents Limits: |Iij|≤|Iij|max

0≤PDG≤0.3∑i=1NLPload

PDGi is the real power generation of DG at bus i, PDi is the power demand at bus i, Iij is the current between buses i and j. Ri is the resistance.

The current Ii is determined from the load flow using Hybrid load flow studies Method called Backward – Forward and Newton Raphson. For single source network all the power is supplied by the source but with DG that are optimally placed there is going to be reduction in power loss. [4] This reduction in power loss is determined as the difference of the power loss with DG and without DG. Thus, the new power loss in the network with DG is:

(3)Pl−new=∑i=1N|Iinew|2Ri

Where j = 1 for a feeder with DG or else j = 0 Hence, the power loss reduction ( Plossr ) value for bus i with DG is obtained by subtracting (4) from (5) as;

Plossri=PL−new−PL
(5)Plossri=−∑i=1N(2JIiIDGRi+JIiIDG2)Ri

The bus that gives the highest value of Plossr is selected as the optimal location of DG. The concern is to place the DG at a location that will give maximum loss reduction. Differentiating equation (5) with respect to IDG and equating it to zero, gives the DG current that will give maximum loss reduction, therefore the current is given by equation (6) below.

(6)IDGi=−∑i=1nIaiRi∑i=1nRi

The procedure is repeated for all the buses in order to obtain the highest power loss reduction value as the DG units are singly located. Assuming there is no significant changes in the voltage as DG units are connected, the power that can be generated is;

(7)PPDGi=IIDGVVi

Where, Vi is the voltage magnitude of the bus i and the optimum DG size is obtained from equation (7). The optimal location of the DG is bus i for maximum power loss reduction.

III. PROTECTION COORDINATION PROBLEM FORMULATION

Protection of power system is typically tuned in such a way that only the faulted part of the system gets removed when a fault occurs. This tuning is called protection coordination and this becomes worse when DGs are connected because they can negatively affect the system coordination. The coordination of overcurrent relays OCRs could be achieved by determining two setting values: the pickup current ( IP ) and the time dial setting (TDS). The pickup current is the minimum current value for which the relay begins to operate. The TDS adjusts the inverse characteristics of overcurrent device, and hence controls the time delay before relay operates if the fault current reaches a value equal or greater than the pickup current. [2].

The coordination of the relay time settings before the integration of DG was done using eqn. (8), [4].

(8)to=TDS[A(IFIP)p−1+B]

Where;

to is the relay operating time in second

TDS is the time dial setting of the relay

IP is the pickup current setting for the relay.

A, B and p are the standard constants based on relay characteristics as shown in Table 1 (Anderson, 1998)

Table 1: Relay Characteristics (IEEE Standard C37, 2002 and IEEE Standard 1366, 2012)
CharacteristicsABP
Moderately Inverse0.005150.1140.02
Very Inverse19.610.4912.0
Extremely Inverse28.20.12172.0

In the coordination of OCRs, the main aim is to determine the optimum relay parameters including the TDS and IP settings minimizing the total operation time of all protective devices. Therefore, the main objective function can be stated as the minimization of summation of the operating times Top of all protective relays given by eqn. (8) minimize

(9)Top=∑k=1nto,z

Where; n is the number of relays in the system and (to,z) is the operating time of the zth relay.

The objective function is subjected to the following set of constraints:

The requirement of selectivity dictates that when a fault occurs, only the primary relay should operate to trip the fault. If the main relay fails to extinct the fault, the backup relay should clear the fault after a pre specified delay time. It is normally set between 0.2 and 0.5s. [7]: In order to satisfy such requirement, the following constraint must be considered.

(10)Tbackup−Tmain≤CTI

Tmain and Tbackup are the main and backup relays operation time respectively.

CTI is the coordination time interval defined as the minimum time gap in operation between the primary and backup relays. There is always a range for each relay setting, from which feasible solutions are obtained. Therefore other constraint should be considered on the limits of relay parameters including TDS and lp settings that can be expressed as follows.

TDSmin≤TDS≤TDSmax
Ipextmin≤Ip≤Ipextmax

Where;

TDSmin and TDSmax are minimum and maximum limits of the time dial settings

Ipmin and Ipmax are minimum and maximum limits of the pickup current.

The minimum pickup current setting of the relay usually depends on the maximum load current passing through it, while the maximum pickup current setting can be chosen based on the minimum fault current passing through the coil of the relay.

IV. FEEDER RECONFIGURATION PROBLEM FORMULATION

The main objective in feeder reconfiguration is to restore as much load as possible by transferring essential load of the out of service area to the nearby healthy feeder. A minimal number of switch operations is required because of switch life expectancy concerns. Under normal operating conditions, distribution Company periodically reconfigure distribution feeders by opening and closing of switches in order to increase network reliability and reduce line losses. The resulting feeders must remain in radial configuration and meet all load requirements. However, in response to a fault, some of the normally closed switches would be opened in order to isolate the faulted network branches. At the same time, a number of normally open switches would be closed in order to transfer part or all of the isolated branches to another feeder or to another branch of the same feeder. All switches would be restored to their normal positions after removal of the fault. A whole feeder or part of a feeder, may be served from another feeder by closing a tie switch linking the two while an appropriate sectionalizing switch must be opened to maintain radial structures. By changing the state of the switches to transfer loads from one feeder to another, the operating conditions of the overall system may be improved significantly.

Feeder reconfiguration is an important operation tool as well as a fault management technique. During normal operating conditions, the networks are reconfigured to reduce the system power loss, and to relieve the network from the overloads. During abnormal condition, the network can be re arranged so that maximum number of customers retains electrical service. To reduce the system real power losses is also referred as network reconfiguration and to relieve overloads is referred as load balancing. The early studies on the network reconfiguration were directed to the planning stage. In planning, the main objective is to minimize the cost of construction. An early work on network reconfiguration for loss reduction was presented by [6]. They have developed branch and bound type optimization technique to determine the minimum loss configuration.

V. OPTIMAL PLACEMENT OF SWITCHES PROBLEM FORMULATION

The objective function of the optimum switch number and placement problem is to minimize the sum of interruption and investment costs for distribution feeder. Here, the customers' expected outage cost (ECOST) used as an interruption cost reliability index that should be minimized given by eqn. (36): The optimization problem is formulated as;

Minimize Total Cost = ECOST [(p1,p2,p3,…,pn,q1,q2,

(13)q3……qm)+u×SWH+v×BRK]

Where;

ECOST is the expected interruption cost

(14)ECOST=∑k=1NoC∑j=1NoILEkjFjk(gj)αj/yr

NoIL is the number of isolated load points due to kth contingency j

NoC is the number of contingencies

Ekj is the curtailed load at load point k due to contingencies

gj is the average outage time

αi is the average failure rate

Fjk(rj) is the outage cost (/KW)ofloadspointkduetooutagejwithoutagedurationofr_j$

pi is the ith location where a switch is installed

qi is the ith location where breaker is installed

uis the number of switch

v is the number of breaker

SWH is the cost associated with switch

BRK is the cost associated with breaker

Could be noted that the cost associated with switch and breakers includes capital cost, installation cost and maintenance cost. It is assumed that there are N possible locations for installing switches in the network. The cost function is therefore minimized for the optimum number and locations of switches given that m+n≥N. [10]

For adopting this optimization problem in MPSO, N suitable location for installing switches in the network are considered as the swarm dimension. Each agent of the swarm consist of N particles such that after final optimization, each particle state converges to one final state indicating that a breaker, a switch or none of them should be installed at that position.

VI. MODIFIED PSO

The proposed modification considers the worst position also along with the best positions, so we keep track of particle's worst and global worst positions as we do for the best positions in normal PSO. The worst particle here, will be the particle having maximum function value. In each iteration, S 1 particles are selected and named as “bad particles”; others are “good particles”. For these “bad particles”, velocity is updated using particle's worst and global worst positions. [10] Other particles will follow the base PSO's velocity update rules. Here particles, going towards worst positions can explore the region nearby the bad function values during the run. There is possibility that these bad particles find good positions during their search. Then they will transform into the good particles and attract the other particle towards them as they are ruled by the best ones.

In this work, particles already performing worse than others were chosen as “bad particles” in each iteration and get velocity update by worst positions. As the particles which are already performing bad, do not participate much into the velocity update of whole swarm.

Equation of velocity update for modified PSO is as follows; for ith particle and jth iteration with total p iterations is

vid(j+1)=Wnew∗Vid(j)+c1r1k1(pid(j)−Xid(j))+c2r2k2(gid(j)−Xid(j))+c3r3k3(piw(j)−Xid(j))
Xid(j)+c2r2k2(gid(j)−Xid(j))+c3r3k3(piw(j)−xiw(j))+c4r4k4(giw(j)−xiw(j))
xiw(j)+c4r4k4(giw(j)−xiw(j))
(16)xid(jj+11)=xid(jj)+vid(jj)
Wnew=Wstart−Wstart−Wenditermax×iter

Where,

c1,c3 is the cognitive acceleration coefficient,

c2,c4 is the social acceleration coefficient,

gid is the best position vector for the entire swarm consisting of s particles (i.e. Gbest)

giw is the worst position vector for the entire swarm consisting of s particles (i.e. Gworst),

j+1 is the next iteration number,

j is the current iteration number,

k=[k1,k2,k3,k4]=isswitchmatrix. Inthiswork, forparticlesaffectedbybestones,k=[1,1,0,0],whichwillswitchforbadparticlestok=[0,0,1,1].

pid is the best position vector for the ith particle so far (i.e. Pbest of the particle),

piw is the worst position vector for the ith particle so far (i.e. Pworst of the particle),

r1,r2,r3,r4 are n-dimensional column vector whose elements are random numbers selected from a uniform distribution [0,1],

xid is the position of ith particle,

vid is the velocity vector of ith particle,

wis the static inertia weight chosen in the interval [0,1]

Positions of particles are randomly initialized between [lb, ub]. Velocities are also initialized such as they lie between [−Vmin,Vmax] and subsequently trapped in the same velocity interval. Position of the particle will be trapped between [−Xmin,Xmax].

Where

Ib is the lower boundary

ub is the upper boundary

Vmax is the maximum velocity

Vmin is the minimum velocity

Xmax is the maximum particle position

Xmin is the minimum particle position

Table 2: Optimal MPSO parameter settings for placement and sizing of DG
S/NoParameterValue
1.Maximum iteration50
2.Particle sizeN
3.C1,C3 , is the cognitive acceleration coefficient2
4.C2,C4 is the social acceleration coefficient1.5
5.r1,r2,r3,r4 are n dimensional Colum vectors0.8
6W is the static inertia weight0.9
7k1,k2,k3,k4 matrix for best particle[1, 1, 0, 0]
8.k1,k2,k3,k4 matrix for bad particles[0, 0, 1, 1]
9.Maximum inertia weight1
10.Minimum inertia weight0.6

VII. DEVELOPMENT OF ADAPTIVE PROTECTION SCHEME

The developed algorithms in the scheme consist of several functions and each function performs a task in the protection system. The tasks include:

Current and voltage measurement

Fundamental frequency phasors estimation using Fast Fourier Transform (FFT)

Relay coordination using MPSO

Identification of current system topology

Fault detection and Estimation of fault direction using negative-sequence directional element.

In the adaptive protection scheme, communication between the DGs and relays is always performed through a Central Relaying Unit (CRU).

a) Function of each stage

Function of each of the stages in the developed APS are described below.

b) Current and Voltage Measurement

Firstly, current and voltage are measured at each DG to determine the DG's connection status. Then, the DGs connection statuses were received at a CRU through a fiber optic communication channel utilizing the IEC 61850 protocol. The received analog signals were represented by a binary '1' or '0' in case the DG is connected or disconnected respectively.

c) Identification of Current System Configuration

When all the connections signals are received at the CRU, the configuration of the power distribution system is determined. The new system configuration is compared with the old system configuration. If the new configuration is changed, a database containing previously determined minimum and maximum fault currents measured by the relays during system fault analysis was used. The maximum load currents, maximum and minimum fault currents for the existing system configuration are stored in the database. The fixed current transformer (CT) ratios are selected using 125% of the maximum load current at each relay. The tap settings are equally changed based on the system configuration, and are selected using the load current at each relay.

d) Fault Detection and Estimation of Fault Direction

The relays continuously check for fault occurrence. Once a fault is detected, the fault direction is identified using the negative sequence directional element and was implemented in the relays [8]. The relays then send their detected fault direction to the CRU using IEC 61850 protocol. The faulted section is identified when both relays at the beginning and end of that section see the fault in the forward direction.

When the faulted section is identified, the optimal TDS values and tap settings are determined by the CRU for the present system configuration. The optimal settings were determined using previously constructed database. The determined TDS values and tap settings are sent to the relays, using IEC 61850 protocol, to update their protection settings. There is a minimum coordination time of 0.3 s between the closest relay and the upstream relay. The new settings ensured that the closest relay is the fastest acting relay. If there is uncertainty during the faulted section detection, the TDS values and tap settings determined prior to the faulted section identification will be used by the system. The major strong point of Adaptive Protection Scheme (APS) is simplicity of application. [12] Nevertheless, APS has one point of defeat. The protection system does not get updates for any change in the power distribution system's configuration. If there is communication system failure between the DGs, relays and CRU. As such, a backup protection scheme without communication system has been proposed. Block diagram representation of the APS is shown in figure 2.

Figure 2: Adaptive Protection Scheme
Figure 2: Adaptive Protection Scheme
Figure 3: Graphical Representation of the adaptive protection scheme
Figure 3: Graphical Representation of the adaptive protection scheme

VIII. NETWORK MODELLING USING ETAP

Standard IEEE 33 Bus test distribution system was modelled in the ETAP and PSCAD environments with all the components represented. The models are shown in Figures 3 and 4 respectively

Figure 5: PSCAD Model of IEEE 33 Bus test System
Figure 5: PSCAD Model of IEEE 33 Bus test System

IX. RESULTS FOR OPTIMAL PLACEMENT AND SIZING OF DG

To verify and validate the effectiveness of the developed MPSO based optimal placement and sizing of DG. Load flow studies were conducted using Hybrid combination of Back ward – Forward sweep with Newton Raphson method to determine power losses in the test system. MPSO was used to determine the optimal location and size of the DG considering two cases to reduce power losses and to improve voltage profile. The results for DG placement are shown in Tables 3.

Table 3: Best placement, Size and Power Losses
S/NoParameterSingle DGTwo DG
1Best LocationBus 28Bus 18 and 33
2.DG size (MW)1.871.41 and 0.51
3.DG TypeSolarSolar
4.Initial power loss (kW)221.43221.43
5.Final power loss (kW)101.180.21
6.% Power loss Reduction48.8561.51
Table 4: Bus violating Limit
S/NoParameterWithout DGWith 1 DGWith 2 DG
1Bus violating limits1850
2Sum of square of voltage error0.13690.029680
3Total number of customers affected19448430
Figure 7: Voltage profile Plot for case 1
Figure 7: Voltage profile Plot for case 1
Figure 8: Power loss Plot case 1
Figure 8: Power loss Plot case 1
Figure 9: Voltage Profile Plot case 2
Figure 9: Voltage Profile Plot case 2
Figure 10: Power loss Plot case 2
Figure 10: Power loss Plot case 2

current at different locations are shown in Figures 10 and 11.

X. RESULTS FOR SHORT CIRCUIT CURRENT LEVEL SIMULATION

Solar DG with power rating of 1.874 MW was connected at bus 28 and four different types of fault were created at buses 27 and 29. The magnitude of fault

Figure 6: PSCAD Model of Solar PV System
Figure 6: PSCAD Model of Solar PV System
Figure 11: Fault Current for IEEE 33 - Bus Test System with Single DG at Bus 28 and fault at Bus 27
Figure 11: Fault Current for IEEE 33 - Bus Test System with Single DG at Bus 28 and fault at Bus 27
Figure 12: Fault Current for IEEE 33 - Bus Test System with Single DG at Bus 28 and Fault at Bus 29
Figure 12: Fault Current for IEEE 33 - Bus Test System with Single DG at Bus 28 and Fault at Bus 29
Figure 14: Fault Current for IEEE 33 - Bus Test System with Two DG at Bus 33 and Fault at Bus 32
Figure 14: Fault Current for IEEE 33 - Bus Test System with Two DG at Bus 33 and Fault at Bus 32

XI. COORDINATION SIMULATION RESULTS

To investigate the impact of DG on protection coordination, the networks were modelled and simulated using ETAP software for three different distribution networks. The sequence of operation of the protective devices for three phase to ground fault is as shown in Table 5.

Table 5: Sequence of Operation of Protective Devices
Number of DGDG BusFault BusActual trippingCorrect Tripping
PrimaryBackupPrimaryBack up
One DG2829Fuse 3DG1 Relay Main RelayFuse 3Lateral Recloser3, Main Relay
Two DG18 & 3319Fuse 4Lateral Recloser 1, Main RelayFuse 4Lateral Recloser1, Main Relay
Two DG18 & 3334Fuse 3DG2 Relay, Main RelayFuse 3Lateral Recloser 3, Main Relay

XII. FERRO RESONANCE SIMULATION RESULT

To verify the existence of Ferro resonance in the distribution network when there is circuit breaker or fuse failure, part of the network was simulated using PSCAD.

At the 33/11 kV injection substation with 7.5 MVA power transformer, switch was opened on phase B at the time of 0.1s and closed at 0.5s. The bus voltage and the transformer primary and secondary voltages were plotted in Figures 14 and 15.

Figure 13: Fault Current for IEEE 33 - Bus Test System with Two DG at Bus 18 and Fault at Bus 17
Figure 13: Fault Current for IEEE 33 - Bus Test System with Two DG at Bus 18 and Fault at Bus 17
Figure 15: Three-Phase Transformer Bus Voltage
Figure 15: Three-Phase Transformer Bus Voltage

XIII. RELIABILITY EVALUATION

To investigate the reliability of the system, the following reliability indices of the systems were evaluated using ETAP: System Average Interruption Duration Index. System Average Interruption Frequency Index, Expected Energy Not Supplied and ECOST.

Table 6: Reliability Indices XIV. RECONFIGURATION RESULTS
ParameterNumber of DG
Base CaseWith DGOneWith DGTwo
SAIFI1.89770.52310.4470
SAIDI8.20843.44243.0293
CAIDI4.3266.5816.776
EENS29.33616.14711.211
ECOST112,970.4073,976.1140,872.68
ASAI0.99910.99960.9997
ASUI0.000940.000390.00035
AENS0.14240.07840.0544

Optimal number of switches and their locations is presented in Table 7.

Table 7: Number of Switches and their Locations
S/NoDistribution NetworkNumber of SwitchesSwitch Locations
1.IEEE 33 Bus Test System11SW2,SW3,SW5,SW6, SW7, SW8, SW10, SW11, SW12, SW14, SW16,

XV. NETWORK RECONFIGURATION RESULTS FOR IEEE 33 - BUS TEST SYSTEM WITH SINGLE DG

One solar power DG with optimal size as suggested by MPSO was connected to the model of the network at the optimal location. As a result of a fault introduced at a bus immediately after the bus with DG, fuse A3 opened after the third operation of the autorecloser at the beginning of the lateral. To reconfigure the network, SW A3 was manually closed. The model of the network used for the simulation, the number of buses isolated as a result of the fault and the corresponding number of customers and the number of buses restored and the corresponding number of customers are presented in Table 8.

XVI. NETWORK RECONFIGURATION RESULTS FOR IEEE 33 - BUS TEST SYSTEM WITH Two DG

Two solar power DGs with optimal sizes as suggested by MPSO was connected to the model of the network at the optimal locations. As a result of a fault introduced at a bus immediately after the buses with DGs, fuse A2 opened after the third operation of the autorecloser at the beginning of the lateral. To reconfigure the network, SW A4 was manually closed. The model of the network used for the simulation, the number of buses isolated as a result of the fault and the corresponding number of customers and the number of buses restored and the corresponding number of customers are presented in Table

Table 8: Number of Buses and Customers Isolated and Restored
ParametersNumber of DG
Single DGSingle DGTwo DG
Fault Bus29291616
Sectionalizing Switches openedRecloser A3Recloser A3and Fuse A3Recloser A3Recloser A2 and Fuse A2
Tie Switches Closed-SW A3-SW A4
Number of Buses isolated8494
Number of Buses restored0405
Number of Customers isolated46241042621
Number of customers restored0220421

XVII. RESULTS ON DEVELOPMENT OF ADAPTIVE PROTECTION SCHEME

To validate the models created in PSCAD, the bus voltage at each of the buses were compared with the ones obtained using ETAP. And different simulation cases were performed to test the performance of the proposed adaptive protection schemes. Simulations include relay setting update for system configuration change, faulted section identification and interruption by the appropriate breaker. The simulations cases were performed to test all the three distribution systems as follows: The results for the fault current, breaker interruption and relay settings update are all plotted.

The network was modelled using PSCAD. Three cases were simulated for this network. The fault current seen by the relays, the interruption by breaker and the relay settings update were all plotted in Figures 17 to 22.

Figure 16: Transformer Primary and Secondary Voltage
Figure 16: Transformer Primary and Secondary Voltage
Figure 17: Fault Current Seen by Relay R28
Figure 17: Fault Current Seen by Relay R28
Figure 18: Interruption by Breaker BRKA28 for Case I Figure 19: Fault Current Seen by Relay R19
Figure 18: Interruption by Breaker BRKA28 for Case I Figure 19: Fault Current Seen by Relay R19
Figure 20: Interruption by Breaker BRKA19 for Case II
Figure 20: Interruption by Breaker BRKA19 for Case II
Figure 21: Fault Current Seen by Relay R32
Figure 21: Fault Current Seen by Relay R32
Figure 22: Interruption by Breaker BRKA32 for Case III
Figure 22: Interruption by Breaker BRKA32 for Case III

Case I: Simulation of IEEE 33 - Bus Test System power distribution system without DG for all the three types of fault. (Single line to ground, double line to ground and three line to ground). The relay settings are presented in Figure 23

Figure 23: Relay Settings for IEEE 33 - Bus Test System without DG
Figure 23: Relay Settings for IEEE 33 - Bus Test System without DG

Case II: One Solar power plant rated 1.874 MW was connected to the IEEE 33 - Bus Test System power Distribution system at bus 27 as suggested by MPSO.

Single line to ground (A - G) fault was created at bus 28. The relay settings are presented in Figure 24.

Figure 24: Relay Settings for IEEE 33 - Bus Test System for Case II
Figure 24: Relay Settings for IEEE 33 - Bus Test System for Case II

Case III: Two Solar power plants rated 1.4 and 0.5 MW were connected to the IEEE 33 – Bus Test System power distribution system at buses 18 and 33 as suggested by MPSO. Double - line to ground (AB - G) fault was created at bus 19. The relay settings are presented in Figure 25.

Figure 25: Relay Settings for IEEE 33 - Bus Test System for Case III
Figure 25: Relay Settings for IEEE 33 - Bus Test System for Case III

Case IV: Two Solar power plant rated 1.4 and 0.5 MW were connected to the IEEE 33 Bus power distribution system at buses 18 and 33.as suggested by MPSO.

Three - line to ground (ABC - G) fault was created at bus 32. The relay settings are presented in Figure 26.

Figure 26: Relay Settings for IEEE 33 Bus Test System for Case IV
Figure 26: Relay Settings for IEEE 33 Bus Test System for Case IV

Case V: One Solar power plant rated 1.874 MW was connected to the IEEE 33 - Bus Test System power distribution system at bus 27 as suggested by MPSO.

Single line to ground (A - G) fault was created at half the length of the lateral. The relay settings are presented in Figure 27.

Figure 27: Relay Settings for IEEE 33 - Bus Test System for Case V
Figure 27: Relay Settings for IEEE 33 - Bus Test System for Case V

Case VI: Two Solar power plants rated 1.4 and 0.5 MW were connected to the IEEE 33 - Bus Test System power distribution system at buses 18 and 33 as suggested by

MPSO. Double - line to ground (AB - G) fault was created at half the length of the lateral. The relay settings are presented in Figure 28.

Figure 28: Relay Settings for IEEE 33 - Bus Test System for Case VI
Figure 28: Relay Settings for IEEE 33 - Bus Test System for Case VI

Case VII: Two Solar power plants rated 1.4 and 0.5 MW were connected to the IEEE 33 – Bus Test System power distribution system at buses 18 and 33 as suggested by MPSO. Three - line to ground (ABC - G) fault was created at half the length of the lateral. The relay settings are presented in Figure 29.

Figure 29: Relay Settings for IEEE 33 - Bus Test System for Case VII
Figure 29: Relay Settings for IEEE 33 - Bus Test System for Case VII

Case VIII: One Solar power plant rated 1.874 MW was connected to the IEEE 33 Bus power distribution system at bus 27 as suggested by MPSO. Single line to ground (A - G) fault was created at the end of the lateral. The relay settings are presented in Figure 30.

Figure 30: Relay Settings for IEEE 33 - Bus Test System for Case VIII
Figure 30: Relay Settings for IEEE 33 - Bus Test System for Case VIII

Case IX: Two Solar power plants rated 1.4 and 0.5 MW were connected to the IEEE 33 - Bus Test System power distribution system at buses 18 and 33 as suggested by

MPSO. Double - line to ground (AB - G) fault was created at the end of the lateral. The relay settings are presented in Figure 31.

Figure 31: Relay Settings for IEEE 33 - Bus Test System for Case IX
Figure 31: Relay Settings for IEEE 33 - Bus Test System for Case IX

Case X: Two Solar power plants rated 1.4 and 0.5 MW were connected to the IEEE 33 - Bus power Test System distribution system at buses 18 and 33 as suggested by

MPSO. Three - line to ground (ABC - G) fault was created at the end of the lateral. The relay settings are presented in Figure 32.

Figure 32: Relay Settings for IEEE 33 - Bus Test System for Case X
Figure 32: Relay Settings for IEEE 33 - Bus Test System for Case X

XVIII. CONCLUSIONS

DG are often used as back-up power to enhance reliability or as a means of deferring investment in transmission and distribution networks, reducing line losses, deferring construction of large generation facilities, displacing expensive grid supplied power, providing alternative sources of supply in markets and providing environmental benefits. However, power distribution systems integrated with DGs are always subjected to changes in the system configuration. During fault clearance or maintenance requirements, certain DGs might get disconnected. The changes in the configuration may lead to significant changes in the fault current level, which cause mis-coordination and malfunctioning of the previously coordinated directional overcurrent relays. To maintain proper coordination, protection relays should change their settings automatically whenever a change in the power system configuration occurs. Therefore, in this work, communication based adaptive protection scheme that can update the relay settings in accordance with the configuration of the network is proposed for distribution network with distributed generation.

Herein, MPSO was developed to optimally sized and sited DG which provides minimum power loss and enhanced voltage profile. IEEE 33 bus test system was used to test the effectiveness of the technique by integrating one DG and two DGs. And finally deployed for two Nigerian distribution networks: University feeder in Maiduguri and Ran feeder in Bauchi. The optimal location, DG size and percentage power loss reduction obtained for the IEEE 33 bus test system when single DG was integrated is bus 22, 2.59 MW and 47.3% respectively when differential evolution was used while bus 28, 1.89 MW and 48,85% respectively when MPSO was used. For the second case i.e. integration of two DGs, the optimal location, DG size and percentage power loss reduction are buses 20 and 25, 1.58 and 0.97 MW and 50.6% for differential evolution and buses 18 and 33, 1.41 and 0.51 MW and 71.51% for MPSO. It can be concluded from the analysis that MPSO is gives better results in terms of power quality.

In this research, effort has also been made to model the three networks in both ETAP and PSCAD environment and evaluate the impact of DG on the protection systems when DG is integrated in the systems. The type of DG integrated was solar photovoltaic and Hydro power systems. The result shows that there was change in the fault current level and there was unintentional islanding and false tripping as a result of the current contribution from the DG.

The final goal of this research work concerned with the development of adaptive protection scheme for distribution network with DG using PSCAD. The operation of the adaptive protection scheme was verified through several simulation cases. The experimentation was carried out by conducting ten scenario cases with four different fault types. The simulation studies yielded far-reaching results that have been exhaustively discussed.

References

20 Cites in Article
  1. 1. A El-Zonkoly (2011). Optimal placement of multidistributed generation units including different load models using particle swarm optimization. IET Generation, Transmission and Distribution, 5(7), 760-771.
  2. 2. Vinayak N Shet (2017). Distribution Network with Optimal DG Placement and Protection Impacts: Review Analysis. International Journal of Electrical and Electronics Engineering, 4(2), 11-15.
  3. 3. Mojtaba Khanabadi,Meysam Doostizadeh,Ahad Esmaeilian,Mohsen Mohseninezhad (2011). Transmission congestion management through optimal distributed generation's sizing and placement. 2011 10th International Conference on Environment and Electrical Engineering, 1-4.
  4. 4. Mcv Suresh,Belwin Edward,J (2017). Optimal placement of distributed generation in Distribution systems by using shuffled frog leaping algorithm. Engineering and Applied Sciences, 12(3)
  5. 5. M-R Haghifam,H Falaghi,O Malik (2008). Risk-based distributed generation placement. IET Generation, Transmission & Distribution, 2(2), 252-260.
  6. 6. M Sedighizadeh,M Fallahnejad,M Alemi,M Omidvaran,D Arzaghi-Haris (2010). Optimal placement of Distributed Generation using combination of PSO and Clonal Algorithm. 2010 IEEE International Conference on Power and Energy, 1-6.
  7. 7. Perumal Nallagownden,K Mahesh,I Elamvazuthi (2016). A Combined-Model for Uncertain Load and Optimal Configuration of Distributed Generation in Power Distribution System. International Journal of Simulation: Systems, Science & Technology, 17(41)
  8. 8. P,Vijay Babua,S Singh (2015). Optimal Placement of DG in Distribution system for loss Minimization using NLP and PLS Technique. Energy
  9. 9. S Payyala,T Green (2006). Sizing of distributed generation plant through techno-economic feasibility assessment. 2006 IEEE Power Engineering Society General Meeting, 8 pp..
  10. 10. Sunaina Saini,Gagandeep Kaur (2016). Real power loss reduction in distribution network through Distributed Generation integration by implementing SPSO. 2016 International Conference on Electrical Power and Energy Systems (ICEPES), 1, 35-40.
  11. 11. Walid El-Khattam,Y Hegazy,M Salama (2013). Stochastic power flow analysis of electrical distributed generation systems. 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491), 1, 1141-1144.
  12. 12. S Brahma,A Girgis (2004). Development of Adaptive Protection Scheme for Distribution Systems With High Penetration of Distributed Generation. IEEE Transactions on Power Delivery, 19(1), 56-63.
  13. 13. Z Yasin,T Rahman,I Musirin,S Rahim (2010). Optimal Sizing of Distributed Generation by using Quantum-Inspired Evolutionary Programming. 4th International Power Engineering and Optimization Conf
  14. 14. M Sulaiman,O Ahmed,H Mohamed (2015). Communication-based Adaptive overcurrent Protection for Distribution Systems with Distributed Generators. Electric Power Components and Systems, 43(5), 556-565.
  15. 15. H Zeineldin,E El-Saadany,M Salama (2006). Optimal coordination of overcurrent relays using a modified particle swarm optimization. Electric Power Systems Research, 76(11), 988-995.
  16. 16. M Mansour,S Mekhamer,E.-S (2006). El-Kharbawe A modified particle swarm optimizer for the coordination of overcurrent relays using a modified particle swarm optimization Electric. Power System Res, 76(11), 988-995.
  17. 17. Mohamed Mansour,Said Mekhamer,Nehad El-Kharbawe (2007). A Modified Particle Swarm Optimizer for the Coordination of Directional Overcurrent Relays. IEEE Transactions on Power Delivery, 22(3), 1400-1410.
  18. 18. Zahra Moravej,Mostafa Jazaeri,Mehdi Gholamzadeh (2012). Optimal coordination of distance and over-current relays in series compensated systems based on MAPSO. Energy Conversion and Management, 56(3), 140-151.
  19. 19. Masoud Amohadi,Mahmud Fotuhi-Firuzabad (2019). Optimal Placement of Automatic Switching Equipment in Radial Distribution Networks Based on Protective Coordination. Journal of Electrical Engineering & Technology, 14(3), 1127-1137.
  20. 20. Saheli Ray,Aniruddha Bhattacharya,Subhadeep Bhattacharjee (2016). Optimal placement of switches in a radial distribution network for reliability improvement. International Journal of Electrical Power & Energy Systems, 76, 53-68.

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

How to Cite This Article

Modu Abba Gana, Ganiyu Ayinde Bakare, Usman Otaru Aliyu. 2020. "Analysis and Development of Adaptive Protection Scheme for Meshed Distribution Network". Global Journal of Research in Engineering - F: Electrical & Electronic GJRE-F Volume 20 (GJRE Volume 20 Issue F5).

More Citation Formats

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjre

Print ISSN 0975-5861

e-ISSN 2249-4596

Keywords
Classification
GJRE-F Classification FOR Code: 090699
Version of record

v1.2

Issue date
December 3, 2020

Language
English
Order Article Reprint
Experience in AR

Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.

Read in 3D

Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.

Article Matrices
Total Views: 1K
Total Downloads: 47
All Trends

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Analysis and Development of Adaptive Protection Scheme for Meshed Distribution Network

Modu Gana
Modu Gana University of Maiduguri, Maiduguri, Nigeria
Ganiyu Bakare
Ganiyu Bakare <p>University of Maiduguri, Maiduguri, Nigeria</p>
Usman Aliyu
Usman Aliyu <p>University of Maiduguri, Maiduguri, Nigeria</p>