Article Fingerprint
ReserarchID
477WR
In this research we will focus the details of the IT System and business process requirements of IT Package need to be installed at Data Centers. This research details the project requirements, which are to be met by the applications and interfaces required within Data Center between different hardware and software systems. The objective of this research includes the design and development of Data Center architecture, hardware availability, proper installation and commissioning of all related networking equipments, storage devices and high end servers as per the current international standards.
Dr. Utkarsh Seetha. 1970. \u201cDATA CENTER Establishment to run the IT System in POWER UTILITIES\u201d. Unknown Journal GJCST Volume 12 (GJCST Volume 12 Issue 2).
Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.
Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.
Total Score: 108
Country: Unknown
Subject: Uncategorized
Authors: Dr. Utkarsh Seetha, Rajesh Kumar Rolen, Hitesh Sharma (PhD/Dr. count: 1)
View Count (all-time): 151
Total Views (Real + Logic): 20927
Total Downloads (simulated): 11194
Publish Date: 1970 01, Thu
Monthly Totals (Real + Logic):
This study aims to comprehensively analyse the complex interplay between
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.