Increasing Productivity through Facility Layout Improvement using Systematic Layout Planning Pattern Theory

§ Khulna university of Engineering & Technology
‡ Khulna University of Engineering and Technology (KUET)

Send Message

To: Author

Increasing Productivity through Facility Layout Improvement using Systematic Layout Planning Pattern Theory

Article Fingerprint

ReserarchID

H3R01

Increasing Productivity through Facility Layout Improvement using Systematic Layout Planning Pattern Theory Banner

Key Research Insights

Synthesized scholarly intelligence & interactive research assistant
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu
Reading Preferences
Font Size
Line Spacing
Background
This converted HTML version may contain rendering inconsistencies. Please refer to the PDF for the authoritative version, or click here to provide feedback.

Abstract

In this paper ongoing production process layout of jute industry are studied and a new layout will be developed based on the systematic layout planning pattern theory to reduce production cost and increase productivity. The number of equipment and travelling area of material in yarn production have been analyzed. The detailed study of the plant layout such as operation process chart, activity relationship chart and relationship between equipment and area has been investigated. The new plant layout has been designed and compared with existing plant layout. The new plant layout shows that the distance and overall cost of material flow from stores to dispatch area are significantly decreased.

References

6 Cites in Article
  1. 1. Muther (1995). Systematic Layout Planning. Systematic Layout Planning
  2. 2. W Wiyaratn,A Watanapa (2007). Improvement Plant Layout Using Systematic Layout Planning (SLP) for 8. Amine Drira, Henri Pierreval, "Facility layout problems: A survey. Elsevier, Annual Reviews in Control, 31, 255-267.
  3. 3. Chatwadee Tansakul,Jirachai Buddhakulsomsiri,Thananya Wasusri,Papusson Chaiwat,Taweesak Kritjaroen (1991). A GAP ANALYSIS IN SERVICE QUALITY OF THAI LOGISTICS SERVICE PROVIDERS. Proceedings of the 2013 (4th) International Conference on Engineering, Project, and Production Management, 537-550.
  4. 4. Chatwadee Tansakul,Jirachai Buddhakulsomsiri,Thananya Wasusri,Papusson Chaiwat,Taweesak Kritjaroen (1999). A GAP ANALYSIS IN SERVICE QUALITY OF THAI LOGISTICS SERVICE PROVIDERS. Proceedings of the 2013 (4th) International Conference on Engineering, Project, and Production Management, 537-550.
  5. 5. Taho Yang (2007). Multiple-attribute decision making methods for plant layout design problem. Robotics and Computer-Integrated Manufacturing, 23, 126-137.
  6. 6. Anucha Watanapa,Patcharee Phi Chit Kajondecha,Wisitsree Duangpitakwong,Wiyaratn (2011). Analysis Plant Layout Design for Effective Production. International Multiconference of Engineers and Computer scientists, II

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

How to Cite This Article

Md. Riyad Hossain, Subrata Talapatra. 2015. "Increasing Productivity through Facility Layout Improvement using Systematic Layout Planning Pattern Theory". Global Journal of Research in Engineering - J: General Engineering GJRE-J Volume 14 (GJRE Volume 14 Issue J7).

More Citation Formats

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjre

Print ISSN 0975-5861

e-ISSN 2249-4596

Keywords
Classification
GJRE-J Classification FOR Code: 290502
Version of record

v1.2

Issue date
December 31, 2015

Language
English
Order Article Reprint
Experience in AR

Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.

Read in 3D

Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.

Article Matrices
Total Views: 1.1K
Total Downloads: 88
All Trends

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Increasing Productivity through Facility Layout Improvement using Systematic Layout Planning Pattern Theory

Md. Hossain
Md. Hossain Khulna university of Engineering & Technology
Subrata Talapatra
Subrata Talapatra <p>Khulna University of Engineering and Technology (KUET)</p>