Loading menu…

Kanban Based Scheduling in a Multistage and Multiproduct System

§ Enugu State University of Science & Technology, Enug...

Send Message

To: Author

Kanban Based Scheduling in a Multistage and Multiproduct System

Article Fingerprint

ReserarchID

CST28XN3

Kanban Based Scheduling in a Multistage and Multiproduct System Banner

Key Research Insights

Synthesized scholarly intelligence & interactive research assistant
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu
Reading Preferences
Font Size
Line Spacing
Background
This converted HTML version may contain rendering inconsistencies. Please refer to the PDF for the authoritative version, or click here to provide feedback.

Abstract

In the highly competitive manufacturing environment, many companies around the world are searching for ways to improve manufacturing performance. This is in response to changes in the manufacturing environment reflected by shortened product life cycles, diverse customer needs and the rapid progress of manufacturing technology. A JIT tool otherwise referred to as kanban based scheduling is then considered as a suitable management concept for Juhel Pharmaceutical Nigeria Ltd to address the challenges by minimising all the components, particularly on the shop floor. The JIT system is not just related to Kanban implementation but it comprises an all-inclusive approach for improving batch size reduction, setup time reduction, quality, production planning, and human resources management. Mechanisms and operating procedures are required to provide detailed step-by-step instructions for the implementation of a pull system.

References

4 Cites in Article
  1. 1. J Vincent,B Abdul-Karim (2009). Production and Quality Improvement in Electronics Assembly. Production and Quality Improvement in Electronics Assembly
  2. 2. J Mathew,A Bali,Edmund,S (2014). Just-In-Time Information Sharing Architectures in Multiagent Systems. International Joint Conference on Autonomous Agents and Multi-Agent Systems
  3. 3. J Melitus,D Kevin,R Collins (2016). A comparison of strategies to dampen nervousness in MRP systems. Management Science, 32(4), 413-429.
  4. 4. N Uwakwe (2015). A Scalable Design Approach for a Precision Irrigation Data Acquisition System. 2015 ASABE International Meeting

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

How to Cite This Article

Eric C. Okafor. 2017. "Kanban Based Scheduling in a Multistage and Multiproduct System". Global Journal of Computer Science and Technology GJCST-C Volume 17 (GJCST Volume 17 Issue C1).

More Citation Formats

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjcst

Print ISSN 0975-4350

e-ISSN 0975-4172

Keywords
Classification
J.5
H.5.5
D.2.5
Version of record
v1.2

Issue date
April 26, 2017

Language
English
Order Article Reprint
Experience in AR

Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.

Read in 3D

Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.

Article Matrices
Total Views: 1.7K
Total Downloads: 152
All Trends

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Kanban Based Scheduling in a Multistage and Multiproduct System

Eric Okafor
Eric Okafor Enugu State University of Science & Technology, Enugu State, Nigeria.