Relationship between Power Generation and Reservoir Elements in the Jebba Hydroelectric Reservoir, Nigeria.

§ University of Ilorin University of Ilorin

Send Message

To: Author

Relationship between Power Generation and Reservoir Elements in the Jebba Hydroelectric Reservoir, Nigeria.

Article Fingerprint

ReserarchID

0Z669

Relationship between Power Generation and Reservoir Elements in the Jebba Hydroelectric Reservoir, Nigeria. Banner

AI TAKEAWAY

Connecting with the Eternal Ground
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu
Font Type
Font Size
Font Size
Bedground

Abstract

Electricity came to Nigeria (in 1896)15 years after it got to England. Despite its long history in Nigeria, electricitygeneration is still at its low ebb with power outages being the order of the day.Power generation is a product of reservoir operation;hence, the understanding of the interactions between them iscrucial to energy supply. This study examines the interactions between electricity generation and reservoir elements in Jebba dam, Nigeria. Monthly data were collected on 11 reservoir elements and on monthly electricity generation from (1989)(1990)(1991)(1992)(1993)(1994)(1995)(1996)(1997)(1998)(1999). Factor-multiple regression and factor-stepwise regression methods were adopted in the interpretation of the relationships between power generation and reservoir elements. A total of 12 factor analytical procedures were carried out, this representone operation per month. This allowed the exhibition of the relationships on monthly basis. The factor analysis reduced the monthly variables to between 3 to 4 orthogonal factors. All the factors were important to the explanation of the variance with the percentages of explanations ranging between 79 and 92%. The result of the regression analyses showed that reservoir elements were strong predictors of power generation in all the months with the exception of April. The percentage explanation for factor multiple regression range from 13 to 98%; while that of factor stepwise regression ranges from 57.8% to 95.7% , with the exception of April when all the variables entered the equation. Twenty one reduce -rank (eqs. 5-26)power generation models were developed for predicting power generation in Jebba.

References

19 Cites in Article
  1. U Aliyu,S Elegba (1990). Prospects for Small Hydropower Development for Rural Applications in Nigeria.
  2. J Aribisala,B Sule (1998). Seasonal operation of a Reservoir Hydropower system.
  3. C Carvalho (2008). High-Dimensional Sparse Factor Modeling: Applications in Gene Expression Genomics.
  4. I Emoabino,A Alayande,O Bamgboye (2007). Tail water recycling for higher efficiency in hydropower -case study of Kainji -Jebba hydropower dams in Nigeria International Conference on Small Hydropower -Hydro Sri Lanka.
  5. A Imevbore (1970). Floating Vegetation of Lake Kainji, Nigeria.
  6. E Ita,W Omorinkoba,N Bankole,B Ibiwoye (1984). A preliminary report on the immediate post impoundment fishery of the newly created Jebba lake.
  7. I Mbagwu,B Ladu,A Amadi (2000). Contributions of the seasonal and long term flood patterns of River Niger to the development and control of water hyacinth (Eichhorniacrassipes) in Kainji Lake, Nigeria.
  8. Nedeco (1959). Niger dam projects. Part 2: hydrology and reservoir operations.
  9. B Olaosebikan,Muschoot,Y Umar (2006). Growth mortality and yield of ParailiaPellucida in the upper portion of Jebba reservoir , Nigeria.
  10. D Olukanni,A Salami (2008). Fitting probability distribution functions to reservoir inflow at hydropower dams in Nigeria.
  11. L Oyebande,J Sagua,Ekpenyong (1980). The effect of Kainji Dam on the hydrological regime, water balance and water quality of the River Niger The influence of man on the hydrological regime with special reference to representative and experimental basins -L'influence de l'hommesur le régime hydrologique avec reference particulière aux étudessur les bassinsreprésentatifs et expérimentaux.
  12. S Sarkar,L (1985). The role and effects of harnessing the River Niger at Kainji and Jebba Scientific Basis for Water Resources Management.
  13. B Sule,A Salami,O Okeola (2009). Operational impact of hydropower generation and highlights on preventive measures in lowland area of river Niger.
  14. G Patel,A Patra,M Dwivedi,S Murakonda,R Pradhan (2008). Physico-textural properties and mass modelling of Indian jujube (Ziziphus mauritiana L.).
  15. K Patra (2001). Hydrology and Water Resources Engineering.
  16. V Sharma (1985). Water Resources Planning and Management.
  17. A Salami,M Raji,B Sule,Y Abdulkareem,S Bilewu (2010). Impacts of climate change on the water resources of Jebba hydropower reservoir.
  18. Q Wang,Bfrm BFRM.
  19. Mike West (2002). Bayesian Factor Regression Models in the “Large p, Small n” Paradigm.

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

How to Cite This Article

Dr. Ifabiyi, I.P.. 1970. "Relationship between Power Generation and Reservoir Elements in the Jebba Hydroelectric Reservoir, Nigeria.". Global Journal of Science Frontier Research - D: Agriculture & Veterinary GJSFR-D Volume 11 (GJSFR Volume 11 Issue D8).

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/GJSFR

Print ISSN 0975-5896

e-ISSN 2249-4626

Keywords
Classification
GJSFR-D Classification FOR Code: 090607
091305
090699
Version of record

v1.2

Language
English
Experiance in AR

Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.

Read in 3D

Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.

Article Matrices
Total Views: 8K
Total Downloads: 547
All Trends

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Relationship between Power Generation and Reservoir Elements in the Jebba Hydroelectric Reservoir, Nigeria.

Dr. I.P.
Dr. I.P. University of Ilorin