Software Cost Estimation using Function Point with Non Algorithmic Approach

1
V.Vignaraj Ananth
V.Vignaraj Ananth
2
Dr. N. Balaji
Dr. N. Balaji
3
N.Shivakumar
N.Shivakumar
1 Thiagarajar College of Engineering

Send Message

To: Author

GJCST Volume 13 Issue C8

Article Fingerprint

ReserarchID

CSTSDET6VA0

Software Cost Estimation using Function Point with Non Algorithmic Approach Banner
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu

Cost estimation is one of the most challenging tasks in project management. It is to accurately estimate needed resources and required schedules for software development projects. The software estimation process includes estimating the size of the software product to be produced, estimating the effort required, developing preliminary project schedules, and finally, estimating overall cost of the project. Nearly one-third projects over run their budget and late delivered and two-thirds of all major projects substantially over run their original estimates. Effort is a function of size. For estimating effort first we face sizing problem. In direct approach size is measured in lines of code (LOC). In indirect approach, size is represented as Function Points (FP). In this paper we use both approach with different technique.

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

V.Vignaraj Ananth. 2013. \u201cSoftware Cost Estimation using Function Point with Non Algorithmic Approach\u201d. Global Journal of Computer Science and Technology - C: Software & Data Engineering GJCST-C Volume 13 (GJCST Volume 13 Issue C8): .

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjcst

Print ISSN 0975-4350

e-ISSN 0975-4172

Classification
Not Found
Version of record

v1.2

Issue date

July 31, 2013

Language

English

Experiance in AR

The methods for personal identification and authentication are no exception.

Read in 3D

The methods for personal identification and authentication are no exception.

Article Matrices
Total Views: 9437
Total Downloads: 2603
2026 Trends
Research Identity (RIN)
Related Research

Published Article

Cost estimation is one of the most challenging tasks in project management. It is to accurately estimate needed resources and required schedules for software development projects. The software estimation process includes estimating the size of the software product to be produced, estimating the effort required, developing preliminary project schedules, and finally, estimating overall cost of the project. Nearly one-third projects over run their budget and late delivered and two-thirds of all major projects substantially over run their original estimates. Effort is a function of size. For estimating effort first we face sizing problem. In direct approach size is measured in lines of code (LOC). In indirect approach, size is represented as Function Points (FP). In this paper we use both approach with different technique.

Our website is actively being updated, and changes may occur frequently. Please clear your browser cache if needed. For feedback or error reporting, please email [email protected]
×

This Page is Under Development

We are currently updating this article page for a better experience.

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Software Cost Estimation using Function Point with Non Algorithmic Approach

Dr. N. Balaji
Dr. N. Balaji
N.Shivakumar
N.Shivakumar
V.Vignaraj Ananth
V.Vignaraj Ananth Thiagarajar College of Engineering

Research Journals