The Economic Development of Dam Construction Projects by Applying a Critical Chain Project Management

Article ID

S98DF

The Economic Development of Dam Construction Projects by Applying a Critical Chain Project Management

Mohammad Javad Khosravi
Mohammad Javad Khosravi Islamic Azad University
DOI

Abstract

The dam construction industry in Iran has always been considered as one of the country’s most important industries due to the lack of rainfall. To accomplish this, we need to properly manage the dam construction process. Traditional algorithms, such as the Critical Paths Methods (CPM) and Program Evaluation and Review Technique (PERT) have been used since ancient times to plan and control most of the projects, including dam construction projects. With traditional methods of project management, a large percentage of time and resources are often lost due to reasons such as the lack of prioritization, student syndrome, and bad multi-tasking. The Critical Chain Project Management (CCPM) is a method for project planning, with emphasis on the resources needed to carry out the project. In this research, which was done on the Kahir reservoir, the CPM method was first used and then analyzed by CCPM method. Using resource dependency, identifying and embedding project buffers and leveling resources in this study reduced the implementation time of the project for 27 days.

The Economic Development of Dam Construction Projects by Applying a Critical Chain Project Management

The dam construction industry in Iran has always been considered as one of the country’s most important industries due to the lack of rainfall. To accomplish this, we need to properly manage the dam construction process. Traditional algorithms, such as the Critical Paths Methods (CPM) and Program Evaluation and Review Technique (PERT) have been used since ancient times to plan and control most of the projects, including dam construction projects. With traditional methods of project management, a large percentage of time and resources are often lost due to reasons such as the lack of prioritization, student syndrome, and bad multi-tasking. The Critical Chain Project Management (CCPM) is a method for project planning, with emphasis on the resources needed to carry out the project. In this research, which was done on the Kahir reservoir, the CPM method was first used and then analyzed by CCPM method. Using resource dependency, identifying and embedding project buffers and leveling resources in this study reduced the implementation time of the project for 27 days.

Mohammad Javad Khosravi
Mohammad Javad Khosravi Islamic Azad University

No Figures found in article.

Mohammad Javad Khosravi. 2019. “. Global Journal of Research in Engineering – E: Civil & Structural GJRE-E Volume 19 (GJRE Volume 19 Issue E2): .

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjre

Print ISSN 0975-5861

e-ISSN 2249-4596

Classification
GJRE-E Classification: FOR Code: 090599
Keywords
Article Matrices
Total Views: 2708
Total Downloads: 1409
2026 Trends
Research Identity (RIN)
Related Research
Our website is actively being updated, and changes may occur frequently. Please clear your browser cache if needed. For feedback or error reporting, please email [email protected]

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

The Economic Development of Dam Construction Projects by Applying a Critical Chain Project Management

Mohammad Javad Khosravi
Mohammad Javad Khosravi Islamic Azad University

Research Journals