Validation of Unit 1 of the Fukushima Daiichi Nuclear Power Plant during its Accident

α
shigenao_maruyama
shigenao_maruyama
σ
Shigenao Maruyama
Shigenao Maruyama

Send Message

To: Author

Validation of Unit 1 of the Fukushima Daiichi Nuclear Power Plant during its Accident

Article Fingerprint

ReserarchID

37486

Validation of Unit 1 of the Fukushima Daiichi Nuclear Power Plant during its Accident Banner

AI TAKEAWAY

Connecting with the Eternal Ground
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu

References

26 Cites in Article
  1. Takuji Yamada,Meitong Duan,Jun Kawahara (2021). Spatio-temporal characteristics of frictional properties on the subducting Pacific Plate off the east of Tohoku district, Japan estimated from stress drops of small earthquakes.
  2. S Maruyama,A Komiya,J Okajima Thermal analysis and control plan of the accident of Fukushima Daiichi Nuclear Power Plant.
  3. Takami Morita (2011). Impact on Marine Biota in Fukushima by TEPCO Fukushima Daiichi Nuclear Power Plant Accident.
  4. (2015). Data on Off-site Decontamination and Remediation Following the Fukushima Daiichi Nuclear Power Plant Accident and Comparison with Global Experience.
  5. Yumiko Suto,Momoki Hirai,Miho Akiyama,Gen Kobashi,Masanari Itokawa,Makoto Akashi,Nobuyuki Sugiura (2012). Biodosimetry of Restoration Workers for The Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station Accident.
  6. S Maruyama (2012). Heat and fluid flow in accident of Fukushima Daiichi Nuclear Power Plant, Unit 1 -When the isolation condenser was working.
  7. Shigenao Maruyama (2012). Heat and Fluid Flow in Accident of Fukushima Daiichi Nuclear Power Plant, Unit 2 (Accident Scenario Based on Thermodynamic Model).
  8. Shigenao Maruyama (2014). Heat and fluid flow in accident of Fukushima Daiichi Nuclear Power Plant, Unit 3 (Behaviour of high pressure coolant injection system (HPCI) based on thermodynamic model).
  9. Yumiko Suto,Momoki Hirai,Miho Akiyama,Gen Kobashi,Masanari Itokawa,Makoto Akashi,Nobuyuki Sugiura (2013). Biodosimetry of Restoration Workers for The Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station Accident.
  10. Yumiko Suto,Momoki Hirai,Miho Akiyama,Gen Kobashi,Masanari Itokawa,Makoto Akashi,Nobuyuki Sugiura (2014). Biodosimetry of Restoration Workers for The Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station Accident.
  11. Yumiko Suto,Momoki Hirai,Miho Akiyama,Gen Kobashi,Masanari Itokawa,Makoto Akashi,Nobuyuki Sugiura (2015). Biodosimetry of Restoration Workers for The Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station Accident.
  12. (2015). Evaluation of the situation of cores and containment vessels of Fukushima Daiichi Nuclear Power Station Units-1 to 3 and examination into unsolved issues in the accident progression.
  13. Yumiko Suto,Momoki Hirai,Miho Akiyama,Gen Kobashi,Masanari Itokawa,Makoto Akashi,Nobuyuki Sugiura (2017). Biodosimetry of Restoration Workers for The Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station Accident.
  14. Shigenao Maruyama (2012). Heat and fluid flow in accident of Fukushima Daiichi Nuclear Power Plant, Unit 3 (Behaviour of high pressure coolant injection system (HPCI) based on thermodynamic model).
  15. Shigenao Maruyama (2014). Heat and fluid flow in accident of Fukushima Daiichi Nuclear Power Plant, Unit 3 (Behaviour of high pressure coolant injection system (HPCI) based on thermodynamic model).
  16. S Maruyama,Yokendo Fukushima; Anovel (2012). Fukushima deemed manmade disaster by Japanese panel.
  17. Seiichi Koshizuka (2011). Report from Investigation Committee on the Accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company.
  18. Tepco (2019). Proposed revision of the medium-and long-term roadmap for decommissioning of the Fukushima Daiichi Nuclear Power Plant.
  19. S Maruyama (2015). Thermal Science for Everyone.
  20. Yumiko Suto,Momoki Hirai,Miho Akiyama,Gen Kobashi,Masanari Itokawa,Makoto Akashi,Nobuyuki Sugiura (2011). Biodosimetry of Restoration Workers for The Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station Accident.
  21. Osamu Oyamada (2011). Several Concerns on Nuclear Safety.
  22. F White (1999). Fluid Mechanics.
  23. H Liepmann,A Roshko (1956). Elements of Gasdynamics.
  24. Kunio Shibata (2011). The Tokyo Electric Power Company (TEPCO) fuel cell evaluation program.
  25. S Abe (2011). The response of the plant owner/operator (TEPCO) to the Fukushima nuclear power plant accident.
  26. S Abe (2011). The response of the plant owner/operator (TEPCO) to the Fukushima nuclear power plant accident.

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

How to Cite This Article

shigenao_maruyama. 2021. \u201cValidation of Unit 1 of the Fukushima Daiichi Nuclear Power Plant during its Accident\u201d. Global Journal of Research in Engineering - F: Electrical & Electronic GJRE-F Volume 21 (GJRE Volume 21 Issue F1): .

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjre

Print ISSN 0975-5861

e-ISSN 2249-4596

Keywords
Classification
GJRE-F Classification: FOR Code: 290903p
Version of record

v1.2

Issue date

April 10, 2021

Language
en
Experiance in AR

Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.

Read in 3D

Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.

Article Matrices
Total Views: 2114
Total Downloads: 1010
2026 Trends
Related Research

Published Article

Abstract not found

Our website is actively being updated, and changes may occur frequently. Please clear your browser cache if needed. For feedback or error reporting, please email [email protected]

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Validation of Unit 1 of the Fukushima Daiichi Nuclear Power Plant during its Accident

Shigenao Maruyama
Shigenao Maruyama

Research Journals