Designing an Optimal Model to Implement and Increase the Profitability of EPC Projects

1
Mehdi Khazaei
Mehdi Khazaei

Send Message

To: Author

GJHSS Volume 22 Issue E7

Article Fingerprint

ReserarchID

9KQO9

Designing an Optimal Model to Implement and Increase the Profitability of EPC Projects Banner
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu

The purpose of this study is to identify the factors affecting on increasing of contractors ‘profits of EPC projects and also to estimate the impact of each factor on the increase of contractors’ profits. For this purpose, a questionnaire based on the components extracted from previous studies was prepared and sent to EPC project experts. At this stage, the factors affecting on profitability of EPC projects were identified according to the PMBOK standard. Then, the opinion of experts on the importance of each of the factors affecting on increasing EPC contractors’ profits was obtained based on the Likert five-choice range and analyzed using SPSS software. The results show that the timely supply of equipment, avoiding of complex administrative bureaucracy, innovation and use of new technologies, adequate expertise and timely financing have the greatest impact on increasing the profits of EPC contractors, respectively.

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

Mehdi Khazaei. 2026. \u201cDesigning an Optimal Model to Implement and Increase the Profitability of EPC Projects\u201d. Global Journal of Human-Social Science - E: Economics GJHSS-E Volume 22 (GJHSS Volume 22 Issue E7): .

Download Citation

Efficient research management methods for improving project outcomes.
Issue Cover
GJHSS Volume 22 Issue E7
Pg. 59- 68
Journal Specifications

Crossref Journal DOI 10.17406/GJHSS

Print ISSN 0975-587X

e-ISSN 2249-460X

Keywords
Classification
GJHSS-E Classification: DDC Code: 343.730526 LCC Code: KF390.I54
Version of record

v1.2

Issue date

February 9, 2023

Language

English

Experiance in AR

The methods for personal identification and authentication are no exception.

Read in 3D

The methods for personal identification and authentication are no exception.

Article Matrices
Total Views: 1567
Total Downloads: 32
2026 Trends
Research Identity (RIN)
Related Research

Published Article

The purpose of this study is to identify the factors affecting on increasing of contractors ‘profits of EPC projects and also to estimate the impact of each factor on the increase of contractors’ profits. For this purpose, a questionnaire based on the components extracted from previous studies was prepared and sent to EPC project experts. At this stage, the factors affecting on profitability of EPC projects were identified according to the PMBOK standard. Then, the opinion of experts on the importance of each of the factors affecting on increasing EPC contractors’ profits was obtained based on the Likert five-choice range and analyzed using SPSS software. The results show that the timely supply of equipment, avoiding of complex administrative bureaucracy, innovation and use of new technologies, adequate expertise and timely financing have the greatest impact on increasing the profits of EPC contractors, respectively.

Our website is actively being updated, and changes may occur frequently. Please clear your browser cache if needed. For feedback or error reporting, please email [email protected]
×

This Page is Under Development

We are currently updating this article page for a better experience.

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Designing an Optimal Model to Implement and Increase the Profitability of EPC Projects

Mehdi Khazaei
Mehdi Khazaei

Research Journals