Using Fuzzy Goal Programming Technique to Obtain the Optimum Production of Vehicle Spare Parts, a Case Study

α
Jasem Alrajhi
Jasem Alrajhi
σ
Hilal A. Abdelwali
Hilal A. Abdelwali
ρ
Elsayed E.M. Ellaimony
Elsayed E.M. Ellaimony
Ѡ
Yousef M. Alhouli
Yousef M. Alhouli
¥
Jasem M.S. Alrajhi
Jasem M.S. Alrajhi
§
Mohsen S. Alardhi
Mohsen S. Alardhi
χ
Ahmed E. Murad
Ahmed E. Murad
α Public Authority for Applied Education and Training

Send Message

To: Author

Using Fuzzy Goal Programming Technique to Obtain the Optimum Production of Vehicle Spare Parts, a Case Study

Article Fingerprint

ReserarchID

K41QK

Using Fuzzy Goal Programming Technique to Obtain the Optimum Production of Vehicle Spare Parts, a Case Study Banner

AI TAKEAWAY

Connecting with the Eternal Ground
  • English
  • Afrikaans
  • Albanian
  • Amharic
  • Arabic
  • Armenian
  • Azerbaijani
  • Basque
  • Belarusian
  • Bengali
  • Bosnian
  • Bulgarian
  • Catalan
  • Cebuano
  • Chichewa
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Corsican
  • Croatian
  • Czech
  • Danish
  • Dutch
  • Esperanto
  • Estonian
  • Filipino
  • Finnish
  • French
  • Frisian
  • Galician
  • Georgian
  • German
  • Greek
  • Gujarati
  • Haitian Creole
  • Hausa
  • Hawaiian
  • Hebrew
  • Hindi
  • Hmong
  • Hungarian
  • Icelandic
  • Igbo
  • Indonesian
  • Irish
  • Italian
  • Japanese
  • Javanese
  • Kannada
  • Kazakh
  • Khmer
  • Korean
  • Kurdish (Kurmanji)
  • Kyrgyz
  • Lao
  • Latin
  • Latvian
  • Lithuanian
  • Luxembourgish
  • Macedonian
  • Malagasy
  • Malay
  • Malayalam
  • Maltese
  • Maori
  • Marathi
  • Mongolian
  • Myanmar (Burmese)
  • Nepali
  • Norwegian
  • Pashto
  • Persian
  • Polish
  • Portuguese
  • Punjabi
  • Romanian
  • Russian
  • Samoan
  • Scots Gaelic
  • Serbian
  • Sesotho
  • Shona
  • Sindhi
  • Sinhala
  • Slovak
  • Slovenian
  • Somali
  • Spanish
  • Sundanese
  • Swahili
  • Swedish
  • Tajik
  • Tamil
  • Telugu
  • Thai
  • Turkish
  • Ukrainian
  • Urdu
  • Uzbek
  • Vietnamese
  • Welsh
  • Xhosa
  • Yiddish
  • Yoruba
  • Zulu

Abstract

This paper studies the vehicle spare parts production problem to obtain the optimum production rate under fuzzy capital budget. We applied the integer goal programming technique to determine the best compromise solution. There are two goals in our case study. These goals are minimization of the uncertain capital budget and maximization of the uncertain expected profits. The case study is a factory which produces different types of vehicle heat exchangers. The results indicate that the problem solution depends on the membership function and the αcut. The optimum quantities of heat exchangers’ production are found to be biased to the lower limit of production.

References

13 Cites in Article
  1. A Abouelnour (1982). An Optimal Distribution of Capital Budgeting in Automobile firms.
  2. Mohan Sasikumar,R (2014). Developing of Decision Support System for Budget Allocation of an R&D Organization.
  3. S Lee,A Lemro (1976). Capital Budgeting for Multiple Objectives.
  4. Luminita Zamfirescu,Constantin-Bala Zamfirescu (2013). Goal Programming as a Decision Model for Performance-Based Budgeting.
  5. S Lee,R Nicely (1974). Goal Programming for Marketing Decisions: A Case Study.
  6. Sang Lee (1972). DECISION ANALYSIS THROUGH GOAL PROGRAMMING.
  7. Jerald Dauer,Robert Krueger (1977). An Iterative Approach to Goal Programming.
  8. Chao-Fang Hu,Chang-Jun Teng,Shao-Yuan Li (2007). A fuzzy goal programming approach to multi-objective optimization problem with priorities.
  9. K Khalili-Damghani,S Sadi-Nezhad,M Tavana (2013). Solving Multi-Period Project Selection Problems with Fuzzy Goal Programming Based on TOPSIS and Fuzzy Preference Relation.
  10. H Mukai (1980). Algorithms for multicriterion optimization.
  11. V Chancong,Y Haimes (1983). Multiobjective Decision Making Theory and Methodology.
  12. M Eid (1996). On Integer MultiCriteria Decision Making Problem.
  13. M Sakawa,Yano (1989). Interactive Decision Making for Multiobjective Nonlinear Programming Problems with Fuzzy Parameters.

Funding

No external funding was declared for this work.

Conflict of Interest

The authors declare no conflict of interest.

Ethical Approval

No ethics committee approval was required for this article type.

Data Availability

Not applicable for this article.

How to Cite This Article

Jasem Alrajhi. 2016. \u201cUsing Fuzzy Goal Programming Technique to Obtain the Optimum Production of Vehicle Spare Parts, a Case Study\u201d. Global Journal of Research in Engineering - J: General Engineering GJRE-J Volume 15 (GJRE Volume 15 Issue J6): .

Download Citation

Journal Specifications

Crossref Journal DOI 10.17406/gjre

Print ISSN 0975-5861

e-ISSN 2249-4596

Keywords
Classification
GJRE-J Classification: FOR Code: 091599
Version of record

v1.2

Issue date

January 17, 2016

Language
en
Experiance in AR

Explore published articles in an immersive Augmented Reality environment. Our platform converts research papers into interactive 3D books, allowing readers to view and interact with content using AR and VR compatible devices.

Read in 3D

Your published article is automatically converted into a realistic 3D book. Flip through pages and read research papers in a more engaging and interactive format.

Article Matrices
Total Views: 3982
Total Downloads: 2053
2026 Trends
Related Research

Published Article

This paper studies the vehicle spare parts production problem to obtain the optimum production rate under fuzzy capital budget. We applied the integer goal programming technique to determine the best compromise solution. There are two goals in our case study. These goals are minimization of the uncertain capital budget and maximization of the uncertain expected profits. The case study is a factory which produces different types of vehicle heat exchangers. The results indicate that the problem solution depends on the membership function and the αcut. The optimum quantities of heat exchangers’ production are found to be biased to the lower limit of production.

Our website is actively being updated, and changes may occur frequently. Please clear your browser cache if needed. For feedback or error reporting, please email [email protected]

Request Access

Please fill out the form below to request access to this research paper. Your request will be reviewed by the editorial or author team.
X

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

High-quality academic research articles on global topics and journals.

Using Fuzzy Goal Programming Technique to Obtain the Optimum Production of Vehicle Spare Parts, a Case Study

Hilal A. Abdelwali
Hilal A. Abdelwali
Elsayed E.M. Ellaimony
Elsayed E.M. Ellaimony
Yousef M. Alhouli
Yousef M. Alhouli
Jasem M.S. Alrajhi
Jasem M.S. Alrajhi
Mohsen S. Alardhi
Mohsen S. Alardhi
Ahmed E. Murad
Ahmed E. Murad

Research Journals