This paper presents a coordinated voltage control scheme for improving the network voltage profile and for minimizing the steady-state loading of the STATCOM to effectively support the system during contingencies. The paper addresses implementation issues associated with primary voltage control and optimal tracking secondary voltage control for wind parks based on self-excited induction generators which comprise STATCOM and under-load tap changer (ULTC) substation transformers. The voltage controllers for the STATCOM and ULTC transformer are coordinated and ensure the voltage support.